Aiken Electric Cooperative customers, South Carolina · Free service

H2O Select PLUS 2 Water Heater and Timer Program (Aiken Electric Cooperative)

Run by Aiken Electric Cooperative

Aiken Electric Cooperative members who own their home can get a free high-efficiency 50- or 85-gallon electric water heater. Add a peak-control timer and installation is free plus a $2.50 monthly bill credit for 10 years; a timer alone on an existing tank pays $200 cash plus the same credit.

Open Checked Oct 25, 2026
Apply before you buy or install anything.Purchases made first don't qualify.

Amounts

How much you get

Free high-efficiency 50- or 85-gallon electric water heater. The amount depends on which of these fits your install.

What you installYou get
Timer only on an existing 50- or 85-gallon electric water heater: $200 cash plus $2.50 per month credit for 10 years$200
Free new water heater with a timer: free normal installation plus $2.50 per month credit for 10 yearsN/A
Free new water heater without a timer: member pays a $200 normal installation fee (free for a gas change-out)N/A
Energy-efficient new construction contract home: $250 cashBuilding an all-electric$250

Eligibility

Do I qualify?

You need to meet all 6 of these.

  • Active Aiken Electric Cooperative member, or owner of a primary residence served by Aiken Electric Cooperative.

  • You must own the property, and it should be your primary residence. Non-residential structures are not eligible.

  • Manufactured homes may qualify if the mobile home is permanently attached to land you also own.

  • Proper wiring and space for a normal installation: 10-2 copper wire with ground and a 30 amp, two-pole breaker. Homes on a public water system need an expansion tank at the member's cost.

    What to doHave an electrician bring the wiring up to the stated requirement and budget for an expansion tank if you are on city water.

  • Sign an agreement to buy power from Aiken Electric and keep the water heater and/or timer active in the home for at least 10 years. Leaving early may mean repaying unrecovered costs.

    What to doSign the 10-year H2O Select PLUS 2 agreement with Aiken Electric Cooperative.

  • Water heaters must be installed by an approved Aiken Electric contractor.

    What to doUse an installer approved by Aiken Electric Cooperative.

Applying

How to apply

You apply by phone. Get approved before you buy anything.

  1. Contact Aiken Electric Cooperative to choose an option.

    Free water heater with or without a timer, or a timer on your existing 50- or 85-gallon tank. Call 803-649-6245 or email memberservices@aikenco-op.org.

    Go to aikenco-op.org

  2. Sign the 10-year program agreement.
  3. Have the water heater and/or timer installed by an approved Aiken Electric contractor.

    Without a timer, pay the $200 installation fee up front or over up to 36 months on your bill (9.9% interest).

  4. Receive the cash payment and monthly bill credits.

Forms and instructions, including for applying by mailAiken Electric Cooperative: Contact Us

Questions about applying803-649-6245 or memberservices@aikenco-op.org

Your address

Next steps

Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.

FAQ

Questions

How much does H2O Select PLUS 2 Water Heater and Timer Program (Aiken Electric Cooperative) pay?

$200 to $250, depending on what you install. The table under How much you get lists each amount.

Do I need to be a Aiken Electric Cooperative customer?

Yes. It’s only for homes in Aiken Electric Cooperative customers, South Carolina. See Do I qualify for the details.

Do renters qualify?

You must own the property, and it should be your primary residence. Non-residential structures are not eligible.

Do I have to use a contractor?

Yes. Water heaters must be installed by an approved Aiken Electric contractor.

Do I need approval before I buy?

Yes. Apply before you buy or install anything; purchases made first don’t qualify. Proper wiring and space for a normal installation: 10-2 copper wire with ground and a 30 amp, two-pole breaker. Homes on a public water system need an expansion tank at the member's cost. Have an electrician bring the wiring up to the stated requirement and budget for an expansion tank if you are on city water.

Is it still available?

Yes. It was open when we last checked, on October 25, 2026.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Aiken Electric Cooperative: H2O Select PLUS 2aikenco-op.org · Read Oct 25, 2026 · Re-checked weekly
  2. Aiken Electric Cooperative: Contact Usaikenco-op.org · Read Oct 25, 2026 · Re-checked monthly

When one of these pages changes, we re-check this page against it.

Report a problem with this page

Nearby

More in South Carolina

  • All of South Carolina

    Housing Preservation Initiative (SC Housing Trust Fund home repair)

    Up to $75,000

    SC Housing pays for essential repairs to low-income homeowners' primary homes, including HVAC, water heaters, roofs, windows, doors and attic insulation, up to $30,000 (Tier I) or $75,000 (Tier II). Repairs under $15,000 are a grant; larger ones are a forgivable loan. Apply through an approved local sponsor.

    Checked Oct 25, 2026

  • Georgetown County, South Carolina

    City of Georgetown Home Energy Audit and Weatherization Program

    Amount varies

    The City of Georgetown, with Santee Cooper and local partners, offers home energy audits and weatherization repairs; income-qualified households can get free work, and others can get a city-funded audit and a low monthly payment plan while funding lasts.

    Checked Oct 25, 2026

  • York County Natural Gas Authority customers, South Carolina

    Energy Conservation Program Conversion Rebates (York County Natural Gas Authority)

    Up to $400 back

    York County Natural Gas Authority credits homeowners who switch from propane, oil or electric to natural gas: $400 for a furnace or gas pack, $400 for a water heater, $75 for a dryer and $50 for a range, up to $925 per address.

    Checked Oct 25, 2026