Go Electric rebates for smart panels, panels and circuits (SMUD)
Run by Sacramento Municipal Utility District (SMUD)
| What you install | You get |
|---|---|
| Smart panel installation (panel size not increased) | $2,000 |
| Like-for-like meter panel replacement with smart panel installation | $2,500 |
| Like-for-like meter panel replacement (with a heat pump conversion) | $1,500 |
| Subpanel (with a heat pump conversion) | $500 |
| New range, cooktop or dryer circuit, each (with a heat pump conversion) | $500 |
Smart panel ($2,000; from SMUD's qualified products list, 200 amps or less), Like-for-like meter panel replacement ($2,500 with a smart panel; $1,500 with a heat pump conversion), Subpanel ($500, with a heat pump conversion), Range circuit ($500, with a heat pump conversion), Cooktop circuit ($500, with a heat pump conversion) and Clothes dryer circuit ($500, with a heat pump conversion).
How to applyYour contractor applies for you.
- Pick a SMUD Contractor Network contractor
- Install a smart panel, or convert to a heat pump first for the meter panel, subpanel and circuit rebates
- Have the panel and circuits installed
- Contractor submits the rebate