Chippewa Valley Electric EV Charger Rebate

Run by Chippewa Valley Electric Cooperative

Chippewa Valley Electric Cooperative pays $500 for an EV charging station, $1,000 for a smart charging station with integrated metering or up to $200 toward installing a second meter, on the co-op's load control.

Open Verified on Nov 13, 2026 Report a correction

Tracked since Nov 5, 2026. No change to its status, amount, dates or rules since. We re-read its official page every month.

Amounts

How much you get

$500 for an EV charging station, $1,000 for a smart charging station with integrated metering or up to $200 toward installing a second meter, on the co-op's load control The amount depends on which of these fits your install.

What you installYou get
Electric vehicle charging station (on load control)$500
Smart EV charging station with integrated metering (on load control)$1,000
Installation cost of a second co-op meter for a regular charger$200
In the program’s own words

“Must be on load control as defined by cooperative $1,000”

“EV Charging Station Installation Costs $200”

“Electric Vehicle Charging Station Must be on load control as defined by cooperative $500”

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • Equipment must be installed on Chippewa Valley Electric's lines for an active member account.

  • The charger must be on the co-op's load control.

    What to doHave Chippewa Valley Electric put the charger on load control (this may need a second meter).

Applying

How to apply

Send it within 3 months of buying or by December 31, 2026, whichever comes first.

  1. Check the 2026 form for the equipment rules before you buy.

    Use the 2026 EV charger incentive form (PDF).

  2. Buy and install the qualifying equipment on the co-op's lines.
  3. Send the completed form with your receipt or invoice.

    Email cvec@cve.coop or mail CVEC, Attn: Rebates, PO Box 575, Cornell, WI 54732, within 3 months of installation.

  4. Receive the rebate from Chippewa Valley Electric.

    The co-op processes the rebate after reviewing the paperwork.

What you'll need
  • Completed 2026 EV charger incentive form

  • Receipt or invoice with purchase price and install date

  • Proof the charger is installed

Forms and instructions, including for applying by mailChippewa Valley Electric Cooperative - 2026 EV charger incentive form (PDF)

Questions about applyingcvec@cve.coop

Your address

Next steps

Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.

FAQ

Questions

How much does Chippewa Valley Electric EV Charger Rebate pay?

$200 to $1,000, depending on what you install. The table under How much you get lists each amount.

Do I need to be a Chippewa Valley Electric Co-op customer?

Yes. It’s only for Chippewa Valley Electric Co-op customers in Wisconsin. See Do I qualify for the details.

Do I need approval before I buy?

The charger must be on the co-op's load control. Have Chippewa Valley Electric put the charger on load control (this may need a second meter).

What’s the deadline?

Apply after it’s installed: within 3 months of purchase or by Dec 31, 2026, whichever comes first.

Is it still available?

Yes. It was open when we last checked, on November 13, 2026.

Does the installation incentive cover installing the charger?

No. It covers only the cost of installing a second co-op meter to control the charger, not the charger's own installation.

What proof of installation do I need?

Along with the form and receipt, include documentation showing the charging station has been installed.

Can the money run out before December 31?

Yes. Funds are limited, so the co-op asks members to send their paperwork as soon as possible.

Can the incentive change during the year?

Yes. The program can change or be cancelled without notice.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Chippewa Valley Electric Cooperative - 2026 EV charger incentive form (PDF)cvecoop.com · Read Nov 13, 2026 · Re-checked monthly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 5, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 5, 2026.

    Report a problem with this page

    Nearby

    More in Wisconsin

    • Barron Electric Co-op customers, Wisconsin

      Barron Electric EV Charger Rebate

      $500 back

      Barron Electric Cooperative pays $500 for an EV charger on its EV load management program (charging is interrupted 2 p.m. to 9 p.m. daily).

      Verified on Nov 13, 2026

    • Clark Electric Co-op customers, Wisconsin

      Clark Electric EV Charger Rebate

      $1,000 back

      Clark Electric Cooperative pays $1,000 for a smart charging station with integrated metering, on the co-op's load control.

      Verified on Nov 13, 2026

    • Jackson Electric Co-op customers, Wisconsin

      Jackson Electric EV Charger Rebate

      Up to $1,000 back

      Jackson Electric Cooperative pays up to $500 for a regular EV charging station or up to $1,000 for a smart charging station, with Time-of-Use billing.

      Verified on Nov 13, 2026