Wattsmart Battery Program (Pacific Power Washington)
Run by Pacific Power
Pacific Power pays Washington homeowners $600 per kW of qualifying home battery, up to $3,000, for letting it manage the battery, plus a yearly bill credit of $15 per kW from the second year. Four-year commitment.
Tracked since Nov 5, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.
Amounts
How much you get
One-time enrollment incentive of $600 per kW of battery output, capped at $3,000 per household (one per site), paid by check, Venmo or PayPal; then a participation bill credit of $15 per kW, paid every year starting in year two. The amount depends on which of these fits your install.
| What you install | You get |
|---|---|
| Per kW of battery outputUpfront enrollment incentive | $600, up to $3,000 |
| From the second yearAnnual participation bill credit per kW | $15 |
One-time enrollment incentive of $600 per kW of battery output, capped at $3,000 per household (one per site), paid by check, Venmo or PayPal; then a participation bill credit of $15 per kW, paid every year starting in year two.
“Residential Batteries $600 per kW (with a maximum of $3,000) $15 per kW”
Eligibility
Do I qualify?
You need to meet all 4 of these.
Pacific Power residential customer with electric service in Washington (the same program serves Oregon).
A qualifying battery, usually paired with onsite solar; a standalone battery requires the Time of Use rate.
What to doInstall a battery from the qualifying list; without solar, switch to the Time of Use rate. See what equipment counts
Your installer must submit a customer generation (net metering) application and get approval before the battery is installed.
What to doHave your installer file the customer generation application before installation.
Four-year commitment with the battery kept connected to the internet; leaving early means repaying a prorated part of the incentive.
Equipment
What equipment counts
The program sets these minimums for solar and batteries.
- Batteries
On Pacific Power's list of qualifying residential batteries.
Applying
How to apply
You apply online. Incentives are reviewed periodically and may change with 30 days notice. Get approved before you buy anything.
- Get an estimate.
Work with an installer (ideally certified by the battery maker) for an eligible battery.
- Net metering application.
Your installer submits it; you both get an approval email from Pacific Power.
- Install the system.
- Apply to Wattsmart Battery.
You and your installer submit one application on the program page.
- Battery check.
Pacific Power and the manufacturer confirm the battery is communicating.
- Receive the incentive.
Check by mail, Venmo or PayPal.
Questions about applyingWattsmartBattery@pacificpower.net
Stacking
Use it with
Your address
Next steps
Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.
Is it available at your address?
Before anything else
Have your installer file the customer generation application before installation.
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does Wattsmart Battery Program (Pacific Power Washington) pay?
$15 to $600 per kW, up to $3,000, depending on what you install. The table under How much you get lists each amount.
Do I need to be a Pacific Power customer?
Yes. It’s only for Pacific Power customers in Washington. See Do I qualify for the details.
Do I need approval before I buy?
Yes. Apply before you buy or install anything; purchases made first don’t qualify. Your installer must submit a customer generation (net metering) application and get approval before the battery is installed. Have your installer file the customer generation application before installation.
What’s the deadline?
No fixed deadline. Apply any time while it’s open.
Is it still available?
Yes. It was open when we last checked, on November 26, 2026.
Do I have to use an approved installer?
No. Any installer works, but Pacific Power strongly suggests one certified by the battery manufacturer, because the incentive depends on a working connection.
Can I enroll a battery I already have?
Yes, if it's a qualified model, but you only get the annual bill credit, not the upfront incentive.
Can I leave the program?
Yes, with 30 days notice, but you repay a prorated part of the incentive if you leave during the four-year commitment.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 5, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 5, 2026.
Nearby
More in Washington
All of Washington
Solar Energy System Sales and Use Tax Exemption, Washington
Amount varies
In Washington, solar energy systems that generate 1 kW to 100 kW AC, and their installation by a qualifying contractor, are exempt from sales and use tax for purchases through Dec. 31, 2029. Give the seller an exemption certificate, or ask the Department of Revenue for a refund if you were charged tax.
Verified on Nov 13, 2026
Inland Power & Light customers, Washington
BEST Low-Interest Energy Loan (Inland Power & Light, Washington)
Up to $50,000 loan
Inland Power & Light's BEST program lends member homeowners $1,000 to $50,000 at 5% for heat pumps, hybrid water heaters, insulation, windows, appliances, solar and batteries.
Verified on Nov 25, 2026
Puget Sound Energy customers, Washington
PSE Flex Batteries (with Enhanced Incentives)
Up to $10,000
PSE pays $75 per kWh of home battery storage (up to $1,000) to enroll in Flex Batteries, plus $0.50 per kWh during events; qualifying households can get up to $10,000 (or $5,000) more toward a new battery.
Verified on Nov 22, 2026