Ready EV Home Charger Rebate, South Dakota and Wyoming (Black Hills Energy)

Run by Black Hills Energy (Ready EV program)

Black Hills Energy electric customers in western South Dakota, Weston County and Cheyenne (Laramie County), Wyoming who drive an electric or plug-in hybrid vehicle get up to $500 for buying and installing a qualifying Level 2 home charger in 2026. Apply by December 31, 2026.

Open Verified on Nov 13, 2026 Report a correction

Tracked since Nov 5, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Amounts

How much you get

Up to $500 toward buying and installing a qualifying Level 2 (240 volt) home charger, not more than the cost of the equipment and installation.

In the program’s own words

“ChargePoint Home Flex NEMA 6-50 or NEMA 14-50 Plug or hardwire Up to $500”

Eligibility

Do I qualify?

You need to meet all 4 of these.

  • Residential Black Hills Energy electric customer in good standing, living in a home with Black Hills Energy electric service.

  • You must drive an electric vehicle (all-electric or plug-in hybrid).

  • A qualified electrician must install the charging station and its dedicated circuit.

    What to doHire a qualified electrician to install the charger and its dedicated circuit. Get a quote from a contractor

  • A new Level 2 (240 volt) charger from a provider approved by Black Hills Energy, connected to Wi-Fi, with charger usage data shared with Black Hills Energy.

Equipment

What equipment counts

The program sets these minimums.

  • Qualifying Level 2 (240 volt) Wi-Fi connected smart charger; the 2026 form lists ChargePoint Home Flex (NEMA 6-50 or NEMA 14-50 plug, or hardwired).

Applying

How to apply

Follow these steps.

  1. Buy a qualifying Level 2 smart charger (the 2026 form lists the ChargePoint Home Flex).
  2. Have a qualified electrician install the charger and its dedicated circuit, with any permits required.
  3. Fill out and sign the application and data release, attaching receipts for the charger and installation.
  4. Email it to ReadyEV@blackhillsenergy.com or mail it so Black Hills Energy receives it by December 31, 2026.

    Mail to Black Hills Energy, Attn Electric Vehicle Program, P.O. Box 1400, Rapid City, SD 57709.

    Go to blackhillsenergy.com

What you'll need
  • Receipts for the charger purchase and the electrical installation

  • ChargePoint serial number

  • Signed homeowner data release

Forms and instructions, including for applying by mailElectric Vehicle Charger Rebate Application, South Dakota and Wyoming Residential Customers, 2026 (PDF) · Cheyenne Electric - Laramie County residential rebates (Black Hills Energy)

Questions about applyingReadyEV@blackhillsenergy.com

Your address

Next steps

Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.

FAQ

Questions

How much does Ready EV Home Charger Rebate, South Dakota and Wyoming (Black Hills Energy) pay?

Up to $500 back.

Do I need to be a Black Hills Energy, Black Hills Power , Wyoming or Cheyenne Light, Fuel and Power customer?

Yes. It’s only for Black Hills Energy, Black Hills Power , Wyoming and Cheyenne Light, Fuel and Power customers in South Dakota. See Do I qualify for the details.

Do I have to use a contractor?

Yes. A qualified electrician must install the charging station and its dedicated circuit.

What’s the deadline?

Apply by December 31, 2026. Equipment bought or installed from January 1, 2026 to December 31, 2026 qualifies.

Is it still available?

Yes. It was open when we last checked, on November 13, 2026.

Is the charger rebate taxable?

It can be. You are responsible for any tax owed as a result of receiving the rebate.

Will Black Hills Energy inspect my charger?

It may. Black Hills Energy can select you for an audit of the installation, and can take the rebate back if the charger wasn't installed according to the program terms.

Can the rebate check be sent to someone else?

Yes. The application has a space for the name and address the check should go to if it's different from the account holder's.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Electric residential rebates for South Dakota and Weston County, Wyoming (Black Hills Energy)blackhillsenergy.com · Read Nov 13, 2026 · Re-checked weekly
  2. Electric Vehicle Charger Rebate Application, South Dakota and Wyoming Residential Customers, 2026 (PDF)blackhillsenergy.com · Read Nov 13, 2026 · Re-checked monthly
  3. Cheyenne Electric - Laramie County residential rebates (Black Hills Energy)blackhillsenergy.com · Read Nov 13, 2026 · Re-checked weekly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 5, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 5, 2026.

    Report a problem with this page

    Nearby

    More in South Dakota

    • Otter Tail Power Company customers, South Dakota

      Otter Tail Power EV Charging Station Rebate (South Dakota)

      $500 back

      South Dakota Otter Tail Power customers get $500 for installing a hardwired Level 2 EV charger on a qualified off-peak rate (Dual Fuel, Deferred Load, Fixed Time of Delivery or Residential Demand Control).

      Verified on Nov 13, 2026

    • Customers of City of Arlington Municipal Utilities, City of Aurora Municipal Utilities, City of Bryant Municipal Utilities and 16 more utilities, South Dakota

      Power Forward EV Charger Rebate (Heartland Energy city utilities)

      $500 back

      Customers of 18 South Dakota city electric utilities served by Heartland Energy and of Sioux Falls Light and Power can get $500 for buying and installing a Wi-Fi connected Level 2 smart charger at home in 2026.

      Verified on Nov 13, 2026

    • Union County Electric Co-op customers, South Dakota

      Union County Electric EV Ready Wiring Rebate

      $100 back

      Union County Electric gives members $100 toward wiring a 40-amp or larger circuit for a Level 2 home EV charger, now or in the future.

      Verified on Nov 13, 2026