Renewable Energy & Storage Rebates (Central Lincoln PUD)

Run by Central Lincoln People's Utility District (rebates processed by Efficiency Services Group)

Central Lincoln PUD pays $500 per kW DC for net-metered solar or wind systems, up to $2,000, and covers the purchase price of batteries added to a qualifying system, up to $2,000. Micro-hydro gets $0.05 per kWh per year, up to $2,000.

Open Verified on Nov 28, 2026 Report a correction

Tracked since Nov 4, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Apply before you buy or install anything.Purchases made first don't qualify.

Amounts

How much you get

Solar or wind: $500 per kW DC, up to $2,000. The amount depends on which of these fits your install.

What you installYou get
Per kW DCSolar electric$500, up to $2,000
Per kW DCWind electric$500, up to $2,000
Battery storage (purchase price)Up to $2,000
Per kWh per yearHydro electric$0.05, up to $2,000
In the program’s own words

“Incentive Amounts System Type Incentive Maximum Battery storage (added to any qualifying system) Purchase price of battery/batteries (receipt required) $2,000 Hydro electric $0.05 per kWh per year $2,000 Solar electric $500 per kW DC $2,000 Wind electric $500 per kW DC $2,000”

Eligibility

Do I qualify?

You need to meet all 3 of these.

  • Central Lincoln PUD customer with a net-metered system.

  • The contractor must submit the Interconnection and Incentive Application before construction, and the customer must sign a Net Metering Agreement. The system stays off until the green-tagged inspection and net meter installation.

    What to doHave your installer apply and wait for Central Lincoln's approval before installing.

  • Batteries need at least 1 kW DC of generation for every 5 kWh of storage. Additions or expansions of an existing system do not qualify.

Applying

How to apply

Your contractor applies for you. Get approved before you buy anything.

  1. Submit an Interconnection & Incentive Application before installing.
  2. Wait for approval after the technical review.
  3. Install the system and keep it off.
  4. Pass the electrical inspection and get the net meter installed.
  5. Submit the Notice of Project Completion with required documents to get the rebate.

Questions about applying(888) 883-9879 or rebates@esgroupllc.com

Your address

Next steps

Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.

FAQ

Questions

How much does Renewable Energy & Storage Rebates (Central Lincoln PUD) pay?

$0.05 to $500, depending on what you install. The table under How much you get lists each amount.

Do I need to be a Central Lincoln People's Utility District customer?

Yes. It’s only for Central Lincoln People's Utility District customers in Oregon. See Do I qualify for the details.

Do I need approval before I buy?

Yes. Apply before you buy or install anything; purchases made first don’t qualify. The contractor must submit the Interconnection and Incentive Application before construction, and the customer must sign a Net Metering Agreement. The system stays off until the green-tagged inspection and net meter installation. Have your installer apply and wait for Central Lincoln's approval before installing.

Is it still available?

Yes. It was open when we last checked, on November 28, 2026.

Can I turn the system on as soon as it's installed?

No. It must stay off until Central Lincoln has the green-tagged electrical inspection and has installed a net meter in person; brief testing by the installer is allowed.

What if I turn it on early?

You risk losing the rebate. Early activation can cause unsafe backfeeding and may lead to suspended electric service, a denied incentive, or both.

Do I need a net metering agreement?

Yes. You must agree to the Net Metered Customers Policy and sign a Net Metering Agreement.

Can I get another incentive for expanding my system?

No. Only one incentive is issued per system, and additions or expansions of an existing system don't qualify.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Central Lincoln PUD - Renewable Energy & Storage Rebatesclpud.org · Read Nov 28, 2026 · Re-checked weekly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 4, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 4, 2026.

    Report a problem with this page

    Nearby

    More in Oregon

    • All of Oregon

      Alternative Energy System Property Tax Exemption (ORS 307.175)

      Amount varies

      In Oregon, the value a solar, wind, geothermal, water, fuel cell or methane energy system adds to your property is exempt from property tax when the system is net-metered or mainly offsets onsite electricity use. The exemption runs through the property tax year that begins July 1, 2029.

      Verified on Nov 13, 2026

    • Eugene Water & Electric Board customers, Oregon

      Backup Power Program Loan (EWEB)

      $5,000

      EWEB homeowners can borrow up to $5,000 at zero percent interest to buy and install a backup generator or home battery system with a transfer switch.

      Verified on Nov 26, 2026

    • Portland General Electric and Pacific Power customers, Oregon

      Battery Storage Incentive for Homes (Energy Trust of Oregon)

      Up to $400 per kWh, $5,000 max

      Energy Trust of Oregon pays $400 per kWh up to $5,000 (Portland General Electric) or $240 per kWh up to $3,000 (Pacific Power) for a home battery of at least 3 kWh installed with new solar or added to existing solar.

      Verified on Nov 4, 2026