NHEC residential members who install a Level 2 home EV charger on NHEC's EV Time-of-Use rate get up to $300 per charger (two chargers, $600 per property max) after pre-approval and an NHEC inspection. Paperwork is due by December 31, 2026.

Open Verified on Nov 13, 2026 Report a correction

Tracked since Nov 3, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Apply before you buy or install anything.Purchases made first don't qualify.

Amounts

How much you get

Up to $300 for each qualifying Level 2 charging station, up to two stations; the maximum per property is $600.

In the program’s own words

“Each qualifying charging station may receive up to a $300 incentive. The maximum incentive per property is $600.”

Eligibility

Do I qualify?

You need to meet all 4 of these.

  • NHEC residential members, with the charger installed at an active member account in NHEC's service territory.

  • You must enroll in NHEC's EV Time-of-Use rate and stay on it for at least one year; only the EV sub-meter is billed at that rate.

    What to doAgree to the EV Time-of-Use rate on the application; NHEC installs the EV sub-meter at the post-installation inspection.

  • The project must be pre-approved in writing by NHEC before installation begins.

    What to doSubmit the online application and the charger's make and model to NHEC and wait for written pre-approval before any work. NHEC 2026 Residential Off-Peak EV Charging Station Program instructions and checklist

  • Members with an interconnected net-metered system need a separate electric account for the EV meter and pay a $290 line design fee.

Equipment

What equipment counts

The program sets these minimums for ev charging.

  • EV chargers

    UL listed Level 2 charging station.

  • EV chargers

    UL approved meter socket installed on the exterior of the building in-line with the charger circuit, for NHEC's EV sub-meter.

Applying

How to apply

You apply online. All documents must be received by NHEC no later than 12/31/2026; projects must be completed within 90 days of pre-approval. Get approved before you buy anything.

  1. Apply online before any work.

    Use NHEC's Residential Electric Vehicle Charging Station Application; a written application can also be mailed to NHEC EV Program, 579 Tenney Mountain Highway, Plymouth, NH 03264.

    Go to nhec.com

  2. Send the charger's make and model (and an electrician's proposal if you have one).

    Email a receipt, invoice or spec sheet to energy@nhec.com, and share NHEC's wiring diagram with your electrician.

    Go to nhec.com

  3. Wait for written pre-approval.

    Projects must be completed within 90 days of pre-approval.

  4. Install the charger and a UL approved meter socket.

    Self-installation is allowed, but NHEC strongly recommends a licensed electrician.

  5. NHEC inspects and sets the Time-of-Use meter.
  6. Send the paid electrician invoice to energy@nhec.com.

    Go to nhec.com

  7. Receive the incentive.

    NHEC expects to pay within 45 days after project completion.

Forms and instructions, including for applying by mailNHEC 2026 Residential Off-Peak EV Charging Station Program Terms & Conditions · NHEC 2026 Residential Off-Peak EV Charging Station Program instructions and checklist

Questions about applyingenergy@nhec.com

Your address

Next steps

Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.

FAQ

Questions

How much does NHEC Residential Off-Peak EV Charging Station Rebate pay?

Up to $600 back. Up to $300 for each qualifying Level 2 charging station, up to two stations; the maximum per property is $600.

Do I need to be a New Hampshire Electric Co-op customer?

Yes. It’s only for New Hampshire Electric Co-op customers in New Hampshire. See Do I qualify for the details.

Do I need approval before I buy?

Yes. Apply before you buy or install anything; purchases made first don’t qualify. You must enroll in NHEC's EV Time-of-Use rate and stay on it for at least one year; only the EV sub-meter is billed at that rate. Agree to the EV Time-of-Use rate on the application; NHEC installs the EV sub-meter at the post-installation inspection. The project must be pre-approved in writing by NHEC before installation begins. Submit the online application and the charger's make and model to NHEC and wait for written pre-approval before any work.

What’s the deadline?

Apply by December 31, 2026.

Is it still available?

Yes. It was open when we last checked, on November 13, 2026.

Does the time-of-use rate apply to my whole house?

No. Only the electricity recorded on the separate EV meter serving the charger is billed at the EV Time-of-Use rate.

Does the EV rate change?

Yes. NHEC adjusts its rates every May 1 and November 1; the current EV Time-of-Use rate is in NHEC's Schedule of Rates.

Who maintains the charger?

You do. The member is responsible for maintaining the EV charger and its electrical circuit.

References

Sources

This page is built from these official pages, run by the program itself.

  1. NHEC Electric Vehicle Chargingnhec.com · Read Nov 13, 2026 · Re-checked weekly
  2. NHEC 2026 Residential Off-Peak EV Charging Station Program Terms & Conditionsnhec.com · Read Nov 13, 2026 · Re-checked monthly
  3. NHEC 2026 Residential Off-Peak EV Charging Station Program instructions and checklistnhec.com · Read Nov 13, 2026 · Re-checked monthly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 3, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 3, 2026.

    Report a problem with this page