goEV Home Pre-Wiring Incentive

Run by Nebraska Public Power District (EnergyWise), through your local public power utility

Up to $600 for wiring a 240-volt, 32-amp circuit for a future EV charger (100% of the cost in existing homes; $400 in new construction), for customers of NPPD and participating Nebraska public power utilities.

Open Verified on Nov 13, 2026 Report a correction

Tracked since Nov 3, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Amounts

How much you get

Existing homes: 100% of the installed cost, up to $600. The amount depends on which of these fits your install.

What you installYou get
Existing structure100%, up to $600
New construction$400
In the program’s own words

“100% of the cost (maximum of $600) for existing structures for in-home pre-wiring for the installation of a 240-volt, 32-amp (minimum) circuit.”

“$400 incentive for new construction for in-home pre-wiring for the installation of a 240-volt, 32-amp (minimum) circuit.”

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • You must be an electric customer of NPPD or of a participating NPPD wholesale utility (your local public power district or town).

  • A 240-volt, 32-amp minimum circuit (cable or conduit) from the panel to a NEMA 6-50 or 14-50 receptacle location, in a single-family or multifamily home.

    What to doHave an electrician run a qualifying 240-volt circuit and sign the application. See what equipment counts

Equipment

What equipment counts

The program sets these minimums for electrical panels and wiring.

  • 240-volt, 32-amp (minimum) circuit with NM cable and/or conduit per NEC from the load center to a NEMA 6-50 or 14-50 receptacle.

Applying

How to apply

Submit within six months of installation.

  1. Have the circuit installed.

    The electrician or installer signs the application.

  2. Submit the Residential Wiring application to your utility.

    With a photo of the installation, plus the invoice for existing homes, within six months. The photo and invoice can be mailed or emailed.

  3. Receive the incentive.

    Allow 45 days.

What you'll need
  • Residential Wiring Application

  • Photo of the installation

  • Invoice or receipt (existing construction)

Forms and instructions, including for applying by mailResidential Wiring Application for Electric Vehicle Charging Station (goEV, January 2022) · General Guidelines for All Programs - EnergyWise · EnergyWise Nebraska · Save Money - Nebraska Public Power District

Questions about applying1-877-ASK-NPPD (275-6773)

Your address

Next steps

Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.

FAQ

Questions

How much does goEV Home Pre-Wiring Incentive pay?

$400 to $400, depending on what you install. The table under How much you get lists each amount.

Do I need to be a customer of one of the 19 utilities in this program?

Yes. It’s only for customers of Nebraska Public Power District, Norris Public Power District, Loup Power District and 16 more utilities in Nebraska. See Do I qualify for the details.

What’s the deadline?

No fixed deadline. Apply any time while it’s open.

Is it still available?

Yes. It was open when we last checked, on November 13, 2026.

Do I need an electric vehicle to use this?

No. The 240-volt circuit can serve an electric heater, camper, welder or EV charging station.

What proof of the wiring do I send?

A photo of the installation and the signature of the electrician or installer confirming the wiring or conduit is done. Existing homes also need the invoice or receipt.

Can I send the photo and invoice by email?

Yes. They can go by mail or email.

How long does the incentive take?

Allow about 45 days. Incomplete applications can take longer.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Residential Incentives - goEV EnergyWise (NPPD)nppd.energywisenebraskagoev.com · Read Nov 13, 2026 · Re-checked weekly
  2. Residential Wiring Application for Electric Vehicle Charging Station (goEV, January 2022)nppd.energywisenebraskagoev.com · Read Nov 13, 2026 · Re-checked monthly
  3. General Guidelines for All Programs - EnergyWisenppd.energywisenebraska.com · Read Nov 3, 2026 · Re-checked monthly
  4. EnergyWise Nebraskaenergywisenebraska.com · Read Nov 3, 2026 · Re-checked monthly
  5. Save Money - Nebraska Public Power Districtnppd.com · Read Nov 3, 2026 · Re-checked monthly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 3, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 3, 2026.

    Report a problem with this page

    Nearby

    More in Nebraska

    • Customers of Nebraska Public Power District, Norris Public Power District, Loup Power District and 17 more utilities, Nebraska

      goEV Home Charging Station Incentive

      Up to $500 back

      Half the cost of a home EV charging station, up to $500, for customers of NPPD and participating Nebraska public power utilities.

      Verified on Nov 13, 2026

    • Niobrara Electric Association, Niobrara Electric Association and Niobrara Electric Association customers, Nebraska

      Electrify and Save Rebates (Niobrara Electric)

      Up to $1,500 back

      Niobrara Electric members get $500-$1,500 back on an air source heat pump, $500 a ton for new ground source, $350 for a heat pump water heater, $350 for induction replacing gas, and smaller rebates on dryers, thermostats, coolers, fans, fridge recycling, EV chargers and electric yard tools.

      Verified on Nov 13, 2026

    • Wyrulec Company and Wyrulec Company customers, Nebraska

      Electrify and Save Rebates (Wyrulec Company)

      Up to $1,500 back

      Wyrulec members get $500-$1,500 back on an air source heat pump, $500 a ton for new ground source, $350 for a heat pump water heater, $350 for induction replacing gas, and smaller rebates on dryers, thermostats, coolers, fans, fridge recycling, EV chargers and electric yard tools.

      Verified on Nov 13, 2026