Jefferson County Private Sanitary Sewer (Septic) System Replacement Program
This program has a waiting list
It isn’t taking new applications right now, only names for its waiting list. The official page says how to join.
We last checked November 13, 2026. We keep checking, and this page will say so when it opens. See the official page.
Other programs open for Jefferson County, Missouri
These are taking applications in the same area, for other projects.
All of Missouri
Missouri Low Income Home Energy Assistance Program (LIHEAP), including the Energy Crisis Intervention Program (ECIP)
Amount varies
Help with heating and cooling bills for Missouri households at or below 60% of state median income with $3,000 or less in savings. Energy Assistance is a one-time payment; crisis help (ECIP) pays up to $800 in winter or $300 in summer, and can cover furnace or central air repairs. Owners and renters apply through their local agency.
Verified on Nov 13, 2026
All of Missouri
Missouri Low-Income Weatherization Assistance Program
Work done at no cost
Free weatherization for low-income Missouri households (income up to 200% of the federal poverty level, or eligible for LIHEAP), based on an energy audit of the home. Eighteen community action and nonprofit agencies cover the state; owners and renters (with the landlord's permission) can apply.
Verified on Nov 13, 2026
All of Missouri
Missouri Show Me Green Sales Tax Holiday (ENERGY STAR appliances)
Amount varies
Every April 19 to 25, Missouri drops state and local sales tax on new ENERGY STAR certified appliances such as heat pumps, furnaces, air conditioners, water heaters, refrigerators and washers, on up to $1,500 of the price of each appliance.
Verified on Nov 3, 2026
See every open program for your address
Jefferson County Private Sanitary Sewer (Septic) System Replacement Program
Run by Economic Development Corporation of Jefferson County (for Jefferson County CDBG)
Jefferson County's CDBG program gives low- and moderate-income homeowners a two-year forgivable grant of up to $20,000 to replace a failing septic system, including design, permits, installation and five years of maintenance. New applicants go on a waiting list.
Tracked since Nov 3, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.
Amounts
How much you get
A two-year forgivable grant of up to $20,000 to replace a failing septic system, including engineering, soil testing, permits, installation and five years of routine maintenance.
“This program is a two-year forgivable grant of up to $20,000 available to low-to-moderate-income residents at or below 80% of median income for the replacement of a failing private on-site sanitary sewer system (septic system).”
Eligibility
Do I qualify?
You need to meet all 5 of these.
Your home is in Jefferson County, Missouri.
Household income at or below 80% of median income.
For owner-occupied single-family homes only; no rental property. You need home equity at least equal to the assistance.
The home must be in unincorporated Jefferson County or a participating municipality.
The septic system must be verified as failing by Jefferson County Code Enforcement or a state-licensed sewer inspector.
Equipment
What equipment counts
Applying
How to apply
Follow these steps.
- Get the application.
Download it from the EDC's CDBG page or call 636-797-5336 to have a packet mailed.
- Apply and join the waiting list.
The program is temporarily out of funds; qualified applicants are placed on a waiting list until new funds arrive.
- Staff confirm the work qualifies.
Only direct health and safety items in non-working or deteriorated condition qualify.
Forms and instructions, including for applying by mail2025 CDBG Entitlement Programs brochure - EDC of Jefferson County
Questions about applying636-797-5336
Stacking
Use it with
Your address
Next steps
Check that it covers your address. Then, if you want, ask for a contractor quote.
Is it available at your address?
Before anything else
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does Jefferson County Private Sanitary Sewer (Septic) System Replacement Program pay?
Up to $20,000.
Is there an income limit?
Household income at or below 80% of median income.
Do renters qualify?
For owner-occupied single-family homes only; no rental property. You need home equity at least equal to the assistance.
Is it still available?
Waitlist, as of November 13, 2026.
What does the septic grant include?
Everything needed for the new system: engineer drawings, soil microbiology testing, permits, installation and five years of routine maintenance.
How is a failing septic system confirmed?
Through Jefferson County Code Enforcement or a state licensed sewer inspector.
Can I still apply while the program is out of funds?
Yes. EDC still accepts applications, but new qualified applications go on a waiting list until more funds arrive.
Do I need equity in my home?
Yes. The grant is forgivable, but you need home equity equal to the amount of help you receive.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
- Community Development Block Grant (CDBG) Program - EDC of Jefferson County
- 2025 CDBG Entitlement Programs brochure - EDC of Jefferson County
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 3, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 3, 2026.
Nearby