Solar Energy Loan (Columbia Water & Light)
Run by City of Columbia Utilities (Columbia Water & Light)
Columbia Water & Light electric customers who own their home can borrow up to $15,000 at 1% to 5% interest for a solar PV system.
Tracked since Nov 3, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week. Stacks with 1 other open program.
Amounts
How much you get
Up to $15,000 for residential customers; 1% interest up to 3 years, 3% for 4-5 years, 5% for 6-10 years; no prepayment penalty.
“The limit on the solar energy loan is $15,000 for residential and $30,000 for commercial customers.”
Eligibility
Do I qualify?
You need to meet all 3 of these.
City of Columbia Utilities electric customer with good payment history and current property taxes.
You must own the property and have a deed of trust.
The home must meet minimum insulation levels (attic R-50, floor over unconditioned space R-19, crawl space R-10, ducts R-13), and the loan must be approved before installation.
What to doBring insulation up to the required levels (Attic Plus or Home Performance can help) and get loan approval before installing.
Equipment
What equipment counts
Applying
How to apply
You apply by mail. Get approved before you buy anything.
- Fill out, print and sign the Residential Solar Loan Application.
- Return it to City of Columbia Utilities.
P.O. Box 6015, Columbia, MO 65205-6015, or by email; wait for approval.
- Permit and install the system.
- Final loan/rebate inspection.
Bring paid receipts and the final electrical permit; auto-pay is required before closing.
Forms and instructions, including for applying by mailColumbia: Solar Rebates
Questions about applying573.441.5528 or Renewables@CoMo.gov
Stacking
Use it with
Pairs with the solar rebate.
Columbia Water & Light customers, Missouri
Solar Rebate (Columbia Water & Light)
$500 per kW
Columbia Water & Light electric customers get a rebate of $500 per kW for a solar PV system approved before installation, with a premium rebate for systems designed to produce during peak times.
Verified on Nov 24, 2026
Your address
Next steps
Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.
Is it available at your address?
Before anything else
Bring insulation up to the required levels (Attic Plus or Home Performance can help) and get loan approval before installing.
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does Solar Energy Loan (Columbia Water & Light) pay?
Up to $15,000 loan.
Do I need to be a Columbia Water & Light customer?
Yes. It’s only for Columbia Water & Light customers in Missouri. See Do I qualify for the details.
Do renters qualify?
You must own the property and have a deed of trust.
Do I need approval before I buy?
Yes. Apply before you buy or install anything; purchases made first don’t qualify. The home must meet minimum insulation levels (attic R-50, floor over unconditioned space R-19, crawl space R-10, ducts R-13), and the loan must be approved before installation. Bring insulation up to the required levels (Attic Plus or Home Performance can help) and get loan approval before installing.
Can I combine it with other rebates?
Yes, with Solar Rebate (Columbia Water & Light). See Use it with.
Is it still available?
Yes. It was open when we last checked, on November 24, 2026.
Is there a prepayment penalty?
No. There are no prepayment penalties.
What happens if I sell or refinance?
You must pay off the Solar Energy Loan. You may be able to request subordination when refinancing for a lower rate or shorter term; that usually takes at least two months.
Is auto-pay required?
Yes. Auto-pay must be set up before the loan closes.
Will the system be inspected?
Yes. The utility inspects the installed equipment to make sure it meets the program's guidelines before the loan is finalized.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 3, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 3, 2026.
Nearby