People's Energy Cooperative EV Charger Rebates
Run by People's Energy Cooperative
People's Energy Cooperative members get $500 for a hardwired Level 2 EV charger enrolled in energy management or a time-of-use rate, $200 toward installing a secondary meter, or $1,000 for a co-op chargEV smart charger, for 2026 installs.
Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.
Amounts
How much you get
$500 for a hardwired Level 2 charger, plus $200 toward installing a secondary meter for a regular charger, or $1,000 for the co-op's chargEV smart charger with integrated metering. The amount depends on which of these fits your install.
| What you install | You get |
|---|---|
| Enrolled in energy management or time-of-useHardwired Level 2 EV charging station | $500 |
| Installation costs of a secondary meter with a regular EV charger | $200 |
| Bought from the co-opCooperative chargEV-branded 240-volt smart charger with integrated metering | $1,000 |
“Electric Vehicle ‘Smart’ Charger with Integrated Metering purchased from Cooperative Must be Cooperative chargEV-branded 240-volt smart charger; Must enroll in energy management program or Time-of-Use rate; 3-Year Parts Warranty Available through ZEF Energy $1,000”
“Electric Vehicle Charging Station Must enroll in energy management program or Time-of-Use rate $500”
“Electric Vehicle Charging Station Installation Costs Only for installation costs of secondary meter with regular EV charger $200”
Eligibility
Do I qualify?
You need to meet all 3 of these.
You must be a People's Energy Cooperative member and the equipment must be on the cooperative's lines.
The charger must be enrolled and managed through an Energy Management Program or a time-of-use rate for at least five years.
What to doEnroll the charger in the co-op's energy management program or time-of-use rate.
Must be a hard-wired Level 2 charger for a road-licensed vehicle, bought and installed in 2026.
Equipment
What equipment counts
Applying
How to apply
Within three months of purchase, recycling or installation, and before December 31, 2026, or until funds run out.
- Install a hardwired Level 2 charger in 2026.
- Enroll it in energy management or a time-of-use rate.
- Submit within three months.
Email the form, receipts and other papers to rebates@peoplesenergy.coop or mail them to 1775 Lake Shady Ave South, Oronoco, MN 55960, no later than three months after purchase or installation and before Dec. 31, 2026.
- Receive the rebate.
Allow 6 to 8 weeks. Rebates of $400 or less are credited to your bill.
Receipt with price and install date circled
Proof the equipment is installed
Proof of energy management or time-of-use enrollment
Forms and instructions, including for applying by mailPeople's Energy Cooperative 2026 Rebate Summary (PDF) · People's Energy Cooperative 2026 Electric Vehicle Charger Rebate Form (PDF)
Questions about applying(800) 214-2694 or rebates@peoplesenergy.coop
Stacking
Use it with
Your address
Next steps
Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.
Is it available at your address?
Before anything else
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does People's Energy Cooperative EV Charger Rebates pay?
$200 to $1,000, depending on what you install. The table under How much you get lists each amount.
Do I need to be a People's Energy Co-op customer?
Yes. It’s only for People's Energy Co-op customers in Minnesota. See Do I qualify for the details.
Do I need approval before I buy?
The charger must be enrolled and managed through an Energy Management Program or a time-of-use rate for at least five years. Enroll the charger in the co-op's energy management program or time-of-use rate.
What’s the deadline?
Apply after it’s installed: within 3 months of purchase or by Dec 31, 2026, whichever comes first. Equipment bought or installed on or after January 1, 2026 qualifies.
Is it still available?
Yes. It was open when we last checked, on November 13, 2026.
How long does processing take?
Allow 6 to 8 weeks for rebates to be processed.
Will I get a check or a bill credit?
Rebates of $400 or less are issued as a credit on your monthly bill.
Can the charger be for a forklift or off-road vehicle?
No. The charger must be for a vehicle licensed for road use.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
- People's Energy Cooperative - Rebates
- People's Energy Cooperative 2026 Rebate Summary (PDF)
- People's Energy Cooperative 2026 Electric Vehicle Charger Rebate Form (PDF)
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 2, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.
Nearby
More in Minnesota
Agralite Electric Co-op customers, Minnesota
Agralite Electric EV Charger Rebate
Up to $500 back
Agralite Electric pays up to $500 for a hard-wired home EV charger on its load management program.
Verified on Nov 13, 2026
Anoka Municipal Utility customers, Minnesota
Anoka Municipal Utility Residential EV Charger Rebate
Up to $325 back
Anoka Municipal Utility residential customers get $325 (battery EV) or $215 (plug-in hybrid) back after buying and installing a Level 2 EV charger at home.
Verified on Nov 13, 2026
Beltrami Electric Co-op customers, Minnesota
Beltrami Electric EV Charger Rebate
$50 per kW, up to $750
Beltrami Electric Cooperative pays two $50 per kW rebates (up to $500 Power Savers and up to $750 Value of Electricity for a car or light truck) for a Level 2 or Level 3 charger on its daily cycled load management program, installed by December 31, 2026.
Verified on Nov 13, 2026