Elk River Municipal Utilities Electric Vehicle Charger Rebate
Run by Elk River Municipal Utilities
Elk River Municipal Utilities residential customers get up to $700 toward buying and installing a hardwired 240-volt (Level 2) EV charger, which also qualifies the home for ERMU's Electric Vehicle Charging Rates.
Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.
Amounts
How much you get
Up to $700 as a bill credit toward the purchase and installation of a 240-volt home EV charger.
“Receive up to a $700 rebate toward the purchase and installation of a 240-volt electric vehicle (EV) charger for your home. Installation automatically qualifies for Electric Vehicle Charging Rates saving you even more money.”
Eligibility
Do I qualify?
You need to meet all 2 of these.
Residential electric customers of Elk River Municipal Utilities only.
A hardwired EV charger for on-road vehicles, on a 200-amp lever bypass meter socket connected to the panel and used only for EV charging, inspected by a state certified electrical inspector.
What to doHave an electrician install the 200-amp lever bypass meter socket and pass the state electrical inspection; ERMU then installs the meter.
Equipment
What equipment counts
Applying
How to apply
Follow these steps.
- Complete and sign the Electric Vehicle (EV) Charger Rebate Application.
- Attach the itemized receipt or invoice and any required certificate.
- Submit in person, by mail, by email to customerservice@ermumn.com, or online on the rebate page.
- Receive the rebate as a bill credit.
Questions about applying763.441.2020 or customerservice@ermumn.com
Stacking
Use it with
Your address
Next steps
Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.
Is it available at your address?
Before anything else
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does Elk River Municipal Utilities Electric Vehicle Charger Rebate pay?
Up to $700 back.
Do I need to be a Elk River Municipal Utilities customer?
Yes. It’s only for Elk River Municipal Utilities customers in Minnesota. See Do I qualify for the details.
Is it still available?
Yes. It was open when we last checked, on November 24, 2026.
What wiring do I need?
A 200-amp lever bypass meter socket connected directly to your electrical panel, which you're responsible for installing. Your existing electrical system may need upgrades.
Who installs the EV meter?
ERMU's meter technicians, after a state certified electrical inspector has passed the installation.
Can I use the EV circuit for anything else?
No. Power on the EV service may be used only for charging electric vehicles, and the charger must be for on-road vehicles.
Do I get a lower charging rate?
Yes. A qualifying hardwired charger automatically qualifies you for ERMU's Electric Vehicle Charging Rates.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 2, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.
Nearby
More in Minnesota
Agralite Electric Co-op customers, Minnesota
Agralite Electric EV Charger Rebate
Up to $500 back
Agralite Electric pays up to $500 for a hard-wired home EV charger on its load management program.
Verified on Nov 13, 2026
Anoka Municipal Utility customers, Minnesota
Anoka Municipal Utility Residential EV Charger Rebate
Up to $325 back
Anoka Municipal Utility residential customers get $325 (battery EV) or $215 (plug-in hybrid) back after buying and installing a Level 2 EV charger at home.
Verified on Nov 13, 2026
Beltrami Electric Co-op customers, Minnesota
Beltrami Electric EV Charger Rebate
$50 per kW, up to $750
Beltrami Electric Cooperative pays two $50 per kW rebates (up to $500 Power Savers and up to $750 Value of Electricity for a car or light truck) for a Level 2 or Level 3 charger on its daily cycled load management program, installed by December 31, 2026.
Verified on Nov 13, 2026