East Central Energy Level 2 EV Charger Rebate

Run by East Central Energy

East Central Energy gives a $400 bill credit for installing a metered Level 2 EV charger at your primary home on its time-of-use or off-peak storage rate.

Open Verified on Nov 13, 2026 Report a correction

Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every month.

Amounts

How much you get

$400 bill credit for a metered Level 2 charger on the time-of-use or off-peak storage rate.

In the program’s own words

“ECE offers a $400 rebate (applied as a bill credit) to install a metered level 2 charger on either the time-of-use rate or off-peak storage. A meter is required to be installed outside the home to qualify for the rebate. Rebates are for primary residence only. Contact our Energy Services Electricians for details.”

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • You must be an East Central Energy member; primary residence only.

  • The charger must be on the time-of-use or off-peak storage rate with a separate meter installed outside the home.

    What to doContact ECE’s Energy Services electricians at 1.800-254-7944 to set up the meter and rate before installing.

Applying

How to apply

You apply by phone.

  1. Contact ECE Energy Services about the time-of-use or off-peak storage rate.

    1.800.254.7944

  2. Have a Level 2 charger and outside meter installed.
  3. Apply for the rebate.
  4. Receive a $400 bill credit.

Forms and instructionsEast Central Energy - Electric Vehicles flyer 2026 (PDF)

Your address

Next steps

Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.

FAQ

Questions

How much does East Central Energy Level 2 EV Charger Rebate pay?

$400 back.

Do I need to be a East Central Energy customer?

Yes. It’s only for East Central Energy customers in Minnesota. See Do I qualify for the details.

Do I need approval before I buy?

The charger must be on the time-of-use or off-peak storage rate with a separate meter installed outside the home. Contact ECE’s Energy Services electricians at 1.800.254.7944 to set up the meter and rate before installing.

Is it still available?

Yes. It was open when we last checked, on November 13, 2026.

Can I get the rebate for a cabin or second home?

No. The rebate is for your primary residence only.

Do I need an extra meter?

Yes. A meter must be installed outside the home to qualify.

Can I charge any time of day?

On the time-of-use rate, yes. On the off-peak storage rate, power is supplied only during off-peak hours and the charger must be hardwired into your panel.

References

Sources

This page is built from these official pages, run by the program itself.

  1. East Central Energy - Electric Vehicles flyer 2026 (PDF)eastcentralenergy.com · Read Nov 13, 2026 · Re-checked monthly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 2, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.

    Report a problem with this page

    Nearby

    More in Minnesota

    • Agralite Electric Co-op customers, Minnesota

      Agralite Electric EV Charger Rebate

      Up to $500 back

      Agralite Electric pays up to $500 for a hard-wired home EV charger on its load management program.

      Verified on Nov 13, 2026

    • Anoka Municipal Utility customers, Minnesota

      Anoka Municipal Utility Residential EV Charger Rebate

      Up to $325 back

      Anoka Municipal Utility residential customers get $325 (battery EV) or $215 (plug-in hybrid) back after buying and installing a Level 2 EV charger at home.

      Verified on Nov 13, 2026

    • Beltrami Electric Co-op customers, Minnesota

      Beltrami Electric EV Charger Rebate

      $50 per kW, up to $750

      Beltrami Electric Cooperative pays two $50 per kW rebates (up to $500 Power Savers and up to $750 Value of Electricity for a car or light truck) for a Level 2 or Level 3 charger on its daily cycled load management program, installed by December 31, 2026.

      Verified on Nov 13, 2026