Dakota Electric ChargeWise EV Charging Circuit Rebate
Run by Dakota Electric Association
Dakota Electric pays $500 toward the electrician’s cost of a 240-volt EV charging circuit when you put your home charger on its off-peak storage or time-of-use EV rate.
Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every month.
Amounts
How much you get
$500 check toward the installation cost of a 240v EV circuit on the Storage or Time of Use EV program. Charger and vehicle invoices are not accepted.
“Dakota Electric® offers two voluntary options for charging your EV at home as well as a rebate of $500 to assist with the cost of installing a charging circuit on either program.”
Eligibility
Do I qualify?
You need to meet all 2 of these.
You must be a Dakota Electric member.
The charger must be on one of the ChargeWise programs (off-peak storage rate or time-of-use rate) with a Dakota Electric submeter installed; submetering equipment costs $80 to $170 plus tax.
What to doCall Dakota Electric at 651-463-6243 to order the submeter socket, have an electrician install the circuit, pass the state inspection, then schedule the submeter.
Equipment
What equipment counts
Applying
How to apply
Send it within 12 months of buying. Get approved before you buy anything.
- Pick a charging program (storage rate or time-of-use rate).
- Call 651-463-6243 to order the submeter socket.
- Have an electrician install the dedicated EV circuit and submeter socket; pass the state electrical inspection.
- Call Dakota Electric to schedule the submeter installation.
- Submit the rebate form with the electrician’s invoice.
By mail or MyDEA, within one year of the invoice date.
- Receive a check.
Allow 8-12 weeks.
Electrician’s invoice for wiring
Completed EV rebate form
Forms and instructions, including for applying by mailDakota Electric - ChargeWise EV programs packet and 2026 rebate form (PDF)
Stacking
Use it with
Your address
Next steps
Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.
Is it available at your address?
Before anything else
Call Dakota Electric at 651-463-6243 to order the submeter socket, have an electrician install the circuit, pass the state inspection, then schedule the submeter.
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does Dakota Electric ChargeWise EV Charging Circuit Rebate pay?
$500 back.
Do I need to be a Dakota Electric Association customer?
Yes. It’s only for Dakota Electric Association customers in Minnesota. See Do I qualify for the details.
Do I need approval before I buy?
Yes. Apply before you buy or install anything; purchases made first don’t qualify. The charger must be on one of the ChargeWise programs (off-peak storage rate or time-of-use rate) with a Dakota Electric submeter installed; submetering equipment costs $80 to $170 plus tax. Call Dakota Electric at 651-463-6243 to order the submeter socket, have an electrician install the circuit, pass the state inspection, then schedule the submeter.
What’s the deadline?
No fixed deadline. Apply within 12 months of purchase or installation.
Is it still available?
Yes. It was open when we last checked, on November 13, 2026.
Can I switch charging programs later?
It's hard to. The storage and time-of-use programs have different wiring, so choose carefully.
When am I enrolled in the charging program?
Only once Dakota Electric installs the submeter, after the circuit passes state electrical inspection.
How is the rebate paid?
By check. Allow 8-12 weeks; you can mail the form or submit it through the MyDEA portal.
Is there a rebate for changing the circuit later?
No. There is no extra rebate for later changes to the charging circuit or for replacement charging hardware.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 2, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.
Nearby
More in Minnesota
Agralite Electric Co-op customers, Minnesota
Agralite Electric EV Charger Rebate
Up to $500 back
Agralite Electric pays up to $500 for a hard-wired home EV charger on its load management program.
Verified on Nov 13, 2026
Anoka Municipal Utility customers, Minnesota
Anoka Municipal Utility Residential EV Charger Rebate
Up to $325 back
Anoka Municipal Utility residential customers get $325 (battery EV) or $215 (plug-in hybrid) back after buying and installing a Level 2 EV charger at home.
Verified on Nov 13, 2026
Beltrami Electric Co-op customers, Minnesota
Beltrami Electric EV Charger Rebate
$50 per kW, up to $750
Beltrami Electric Cooperative pays two $50 per kW rebates (up to $500 Power Savers and up to $750 Value of Electricity for a car or light truck) for a Level 2 or Level 3 charger on its daily cycled load management program, installed by December 31, 2026.
Verified on Nov 13, 2026