Quick Home Energy Check-up (BGE)

This program is paused

It isn’t taking applications right now (paused since November 6, 2026).

We last checked November 24, 2026. We keep checking, and this page will say so when it opens. See the official page.

Open now: furnace, AC and thermostat programs for BGE customers in Maryland

These cover the same area and are taking applications. Check the ones that fit your home.

  • BGE customers, Maryland

    Home Performance with ENERGY STAR (BGE)

    Up to $15,000 back

    $100 home energy audit, then rebates up to $10,000 (75% of cost) for air sealing, insulation and equipment, or up to $15,000 if you switch a gas, oil or propane system to an electric heat pump.

    Verified on Nov 9, 2026

  • BGE customers, Maryland

    Income-Based Rebates for Home Energy Improvements (BGE)

    Pay about $250 to $750 for up to $15,000 of work

    Free energy audit and heavily discounted air sealing, insulation, heat pump water heater or HVAC work (about $250-$750 out of pocket for up to $15,000 of work) for moderate-income BGE customers.

    Verified on Nov 11, 2026

  • Customers of BGE, SMECO, Potomac Edison and 3 more utilities, Maryland

    Clean Energy Advantage (CEA) Loan

    Up to $50,000 loan

    Loans of $3,000 to $50,000 at 0% APR for the first 24 months for HVAC, insulation, windows and other upgrades done through your utility's EmPOWER rebate program.

    Verified on Nov 24, 2026

Quick Home Energy Check-up (BGE)

Run by BGE (Baltimore Gas and Electric), EmPOWER Maryland

Free one-hour walk-through by a BGE contractor who installs up to 15 energy-saving items (LEDs, smart thermostat for some homes, weatherstripping) and leaves a report.

Paused Verified on Nov 24, 2026 Report a correction

Tracked since Oct 19, 2026. Last change Nov 18, 2026: Status changed from Open to Paused (all changes). We re-read its official page every week.

Amounts

How much you get

No cost to BGE customers. Items installed can include LED bulbs, smart thermostats (not every home qualifies), faucet aerators, efficient showerheads, pipe insulation, door sweeps and weatherstripping.

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • BGE customer.

  • Once every 5 years per address (moving to a new address makes you eligible again).

Applying

How to apply

You apply online. No new check-ups can be scheduled while the Maryland PSC decides whether to extend BGE's energy efficiency programs (since November 6, 2026).

  1. Schedule a Check-up with a BGE-authorized contractor.

    Not possible right now: BGE can't schedule new check-ups until the PSC decides on extending the program.

  2. Contractor walks through the home and installs products.
  3. Receive your personalized report.

Questions about applying877-685-7377

FAQ

Questions

How much does Quick Home Energy Check-up (BGE) pay?

Work done at no cost. No cost to BGE customers. Items installed can include LED bulbs, smart thermostats (not every home qualifies), faucet aerators, efficient showerheads, pipe insulation, door sweeps and weatherstripping.

Do I need to be a BGE customer?

Yes. It’s only for BGE customers in Maryland. See Do I qualify for the details.

What’s the deadline?

No new check-ups can be scheduled while the Maryland PSC decides whether to extend BGE's energy efficiency programs (since November 6, 2026).

Is it still available?

Paused, as of November 24, 2026.

How long does the visit take?

About an hour for the walk-through.

Can I get another check-up later?

Once every 5 years at the same address. If you move to a new address you can get another one.

Who does the check-up?

Only the contractors on BGE's authorized list.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Quick Home Energy Check-upbgesmartenergy.com · Read Nov 18, 2026 · Re-checked weekly

When one of these pages changes, we re-check this page against it.

What changedLast change Nov 18, 2026

Changes to this program’s status, amount, dates and requirements since we first recorded it on October 19, 2026, newest first. Some are corrections we made after re-reading the official page.

    • Status changed from Open to Paused.
    • Deadline removed (was Nov 30, 2026).

Report a problem with this page