RMLD Heat Pump Rebate or 0% Interest Loan
Run by Reading Municipal Light Department
RMLD residential customers get up to $8,000 for a new whole-house heat pump ($2,000 per ton) or $3,000 for a partial-house system, plus 50% of required weatherization up to $3,500; a 0% loan of $10,000 to $40,000 is an alternative to the rebate.
Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.
Amounts
How much you get
Per ton of AHRI cooling capacity, plus a weatherization rebate of 50% of cost up to $3,500. The amount depends on which of these fits your install.
| What you install | You get |
|---|---|
| New heat pump: per tonWhole-house | $2,000, up to $8,000 |
| Replacement heat pump: per tonWhole-house | $400, up to $4,000 |
| New heat pump: per tonPartial-house | $1,000, up to $3,000 |
| Replacement heat pump: per tonPartial-house | $200, up to $2,000 |
| Required weatherization (50% of cost) | 50%, up to $3,500 |
“New heat pump system: $2,000 (two-thousand dollars) per ton up to a maximum of $8,000 (eight-thousand dollars).”
“Replacement heat pump system: $200 (two-hundred dollars) per ton up to $2,000 (two-thousand dollars).”
“Replacement heat pump system: $400 (four-hundred dollars) per ton up to $4,000 (four-thousand dollars).”
“New heat pump system: $1,000 (one-thousand dollars) per ton up to a maximum of $3,000 (three-thousand dollars).”
Eligibility
Do I qualify?
You need to meet all 5 of these.
RMLD residential customer installing at their primary home.
Primary home in RMLD territory.
Weatherization is required with the heat pump unless the home was built in 2010 or later or earlier recommendations were completed.
What to doWeatherize through an Abode-approved home performance contractor.
Not available if you get Mass Save heat pump rebates or a DOER MLP Z-Loan; one rebate per account every 10 years.
Whole-house: attest that existing fossil fuel heating and cooling is disconnected; Manual J required.
What to doHave the installer document disconnection and sizing.
Equipment
What equipment counts
Applying
How to apply
You apply online. Send it within 6 months of buying. Get approved before you buy anything.
- Free consultation with Abode Energy Management.
Call 339-707-0918.
- Pick an approved home performance contractor.
- Contractor gets a UAN from RMLD and a town electrical permit.
- Submit the incentive application via Abode before installing.
Loan applicants must be approved before installation.
- Weatherize and install the heat pump.
- Contractor submits the post-install QA to Abode.
Within 180 days of the final wiring inspection.
- Receive a check.
2 to 4 weeks after RMLD processes it.
Questions about applying781-942-6598
Stacking
Use it with
Your address
Next steps
Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.
Is it available at your address?
Before anything else
Weatherize through an Abode-approved home performance contractor.
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does RMLD Heat Pump Rebate or 0% Interest Loan pay?
$200 to $2,000, depending on what you install. The table under How much you get lists each amount.
Do I need to be a Reading Municipal Light Department customer?
Yes. It’s only for Reading Municipal Light Department customers in Massachusetts. See Do I qualify for the details.
Do renters qualify?
Primary home in RMLD territory.
Do I need approval before I buy?
Yes. Apply before you buy or install anything; purchases made first don’t qualify. Weatherization is required with the heat pump unless the home was built in 2010 or later or earlier recommendations were completed. Weatherize through an Abode-approved home performance contractor.
What’s the deadline?
No fixed deadline. Apply within 6 months of purchase or installation.
Is it still available?
Yes. It was open when we last checked, on November 23, 2026.
Can someone help me compare quotes?
Yes. Abode Energy Management gives RMLD customers free consultations, including help reviewing and comparing contractor quotes.
My home is already weatherized. Do I still need to do weatherization?
Not if you can show it: a home built in 2010 or later, or weatherization recommendations made in 2013 or later that were completed, counts as existing weatherization.
How long until I get the rebate?
It's paid by check within 2 to 4 weeks once RMLD processes it.
If I want the 0% loan, can I install first and apply later?
No. RMLD must approve loan eligibility before installation; applications received after installation aren't eligible.
Plain words
Words used on this page
- Fossil-fuel heating
- Heating that burns gas, oil or propane.
References
Sources
This page is built from these official pages, run by the program itself.
When one of these pages changes, we re-check this page against it.
What changedNo changes since Nov 2, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.
Nearby
More in Massachusetts
All of Massachusetts
DOER MLP Z-Loan (zero-interest loan for municipal light plant customers)
Amount varies
Homeowners served by a Massachusetts municipal light plant can borrow $500 to $25,000 at 0% interest for up to five years for heat pumps, heat pump water heaters, insulation and the prep work those need, after a home energy assessment.
Verified on Nov 2, 2026
Customers of Eversource, National Grid, Nantucket Electric Company and 5 more utilities, Massachusetts
Mass Save Air Source Heat Pump Rebates
Up to $2,650 per ton, $8,500 max
Mass Save pays $2,650 per ton (up to $8,500) for whole-home air source heat pumps, $1,125 per ton for partial-home systems and $250 per ton for basic installs in 2026, installed by a Heat Pump Installer Network contractor.
Verified on Nov 2, 2026
Customers of Eversource, National Grid, Nantucket Electric Company and 5 more utilities, Massachusetts
Mass Save Air to Water Heat Pump Rebate
$2,650 per ton, up to $8,500
Mass Save pays $2,650 per ton, up to $8,500, for an air-to-water heat pump that replaces oil, propane, natural gas or electric resistance heat as the primary heating system in 2026.
Verified on Nov 23, 2026