Hingham Municipal Lighting Plant pays $0.60 per watt for a new solar array, up to 10 kW ($6,000).

Open Verified on Nov 23, 2026 Report a correction

Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Apply before you buy or install anything.Purchases made first don't qualify.

Amounts

How much you get

$0.60 per watt up to 10 kW; lifetime maximum $6,000.

In the program’s own words

“Solar Installation of photovoltaic arrays $0.60/W up to 10 kW Lifetime max. $6,000”

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • Active HMLP account in good standing.

  • Solar systems need HMLP's interconnection application and net metering approval.

    What to doFile HMLP's interconnection application before installing.

Applying

How to apply

You apply online. Get approved before you buy anything.

  1. Submit HMLP's interconnection application.
  2. Install the array.
  3. Apply for the solar rebate.

Forms and instructionsHingham Municipal Lighting Plant (Energy New England)

Questions about applying781-749-0134 or rebates@hmlp.com

Your address

Next steps

Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.

FAQ

Questions

How much does HMLP Solar Rebate pay?

$0.60 per watt, up to $6,000. $0.60 per watt up to 10 kW; lifetime maximum $6,000.

Do I need to be a Hingham Municipal Lighting Plant customer?

Yes. It’s only for Hingham Municipal Lighting Plant customers in Massachusetts. See Do I qualify for the details.

Do I need approval before I buy?

Yes. Apply before you buy or install anything; purchases made first don’t qualify. Solar systems need HMLP's interconnection application and net metering approval. File HMLP's interconnection application before installing.

Is it still available?

Yes. It was open when we last checked, on November 23, 2026.

How is the rebate paid?

Rebates of $500 or less are a credit on your electric account; larger ones come as a refund check.

Can HMLP ask for more information or turn down an application?

Yes. HMLP may request more information or reject rebate applications at any time.

Where do I learn about net metering and interconnection?

In HMLP's Net Metering information and Interconnection Application, which give the program details.

References

Sources

This page is built from these official pages, run by the program itself.

  1. HMLP rebates: all programs and eligibilityhmlp.com · Read Nov 13, 2026 · Re-checked weekly
  2. Hingham Municipal Lighting Plant (Energy New England)ene.org · Read Nov 13, 2026 · Re-checked weekly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 2, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.

    Report a problem with this page

    Nearby

    More in Massachusetts

    • Eversource, National Grid and Nantucket Electric Company customers, Massachusetts

      Mass Save ConnectedSolutions: Battery Storage

      $275 per kW a year

      Cape Light Compact, Eversource and National Grid customers who enroll a home battery in ConnectedSolutions earn $275 per kW of average contribution during summer peak events, about $1,375 a year for a typical 5 kW battery.

      Verified on Nov 13, 2026

    • Customers of Eversource, National Grid, Nantucket Electric Company and 5 more utilities, Massachusetts

      Mass Save HEAT Loan (0% Financing)

      Up to $25,000 loan

      Homeowners who are Mass Save Sponsor customers can borrow up to $25,000 at 0% interest from participating lenders for weatherization, heat pumps, heat pump water heaters, batteries and other qualifying upgrades.

      Verified on Nov 24, 2026

    • All of Massachusetts

      Massachusetts Property Tax Exemption for Solar and Wind Systems (Clause 45)

      Amount varies

      A home solar or wind system in Massachusetts, owned or leased and including one paired with battery storage, is exempt from local property tax for 20 years if it is 25 kW or less or sized to no more than 125% of the property's yearly electricity use.

      Verified on Nov 13, 2026