HMLP Heat Pump Rebates

Run by Hingham Municipal Lighting Plant (HMLP)

Hingham Municipal Lighting Plant customers who heat with oil, electricity, propane or wood get $750 per ton (up to $4,500) for a cold-climate heat pump, plus up to $1,000 for a whole-home system and up to $500 for weatherization.

Open Verified on Nov 23, 2026 Report a correction

Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Amounts

How much you get

$750 per ton up to $4,500, plus a whole-home adder up to $1,000 and a weatherization adder up to $500. The amount depends on which of these fits your install.

What you installYou get
Per tonAir source or ground source heat pump$750, up to $4,500
Whole-home adderUp to $1,000
Weatherization adderUp to $500
In the program’s own words

“HMLP is offering $750 per ton up to $4,500 for customers who install a qualified cold-climate heat pump system with a weatherization adder up to $500 and a whole-home adder up to $1,000 .”

Eligibility

Do I qualify?

You need to meet all 5 of these.

  • Active HMLP account in good standing.

  • For homes heated mainly with oil, electricity, propane or wood; customers who heat mainly with natural gas use Mass Save.

  • A no-cost energy assessment completed in the last three years, or a scheduled one, is required; the rebate is paid once the assessment is done.

    What to doSchedule a no-cost HMLP energy assessment with Energy New England (888-772-4242).

  • The contractor must complete Abode's post-install quality assurance form.

    What to doAsk your installer to submit Abode's QA form with photos. Get a quote from a contractor

  • Equipment must qualify on NEEP's Cold Climate Air-Source Heat Pump list.

    What to doPick a model on the NEEP ccASHP list.

Applying

How to apply

You apply online. Within the same calendar year as the purchase or within six months of purchase (the guidelines also say three months).

  1. Confirm you heat mainly with oil, electricity, propane or wood.
  2. Schedule a no-cost energy assessment.
  3. Optional: weatherize within six months of the install for the adder.
  4. Get a no-cost Abode consultation and choose a contractor.

    Optional pre-approval form recommended.

    Get a quote from a contractor

  5. Install; contractor submits Abode's QA form.

    Get a quote from a contractor

  6. Submit HMLP's online heat pump application.

    In the purchase year or within the stated months of purchase.

    Go to hmlp.com

  7. Receive a check (over $500) or bill credit.
What you'll need
  • Energy assessment or confirmation of a scheduled assessment

  • Abode post-install QA form

  • AHRI certificate and NEEP documentation

  • Paid, itemized installer invoice

Forms and instructionsHMLP rebates: all programs and eligibility

Questions about applying781-749-0134 or rebates@hmlp.com

Your address

Next steps

Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.

FAQ

Questions

How much does HMLP Heat Pump Rebates pay?

$750 to $750, depending on what you install. The table under How much you get lists each amount.

Do I need to be a Hingham Municipal Lighting Plant customer?

Yes. It’s only for Hingham Municipal Lighting Plant customers in Massachusetts. See Do I qualify for the details.

Do I have to use a contractor?

Yes. The contractor must complete Abode's post-install quality assurance form.

Do I need approval before I buy?

A no-cost energy assessment completed in the last three years, or a scheduled one, is required; the rebate is paid once the assessment is done. Schedule a no-cost HMLP energy assessment with Energy New England (888-772-4242).

What’s the deadline?

No fixed deadline. Apply any time while it’s open.

Is it still available?

Yes. It was open when we last checked, on November 23, 2026.

Do I have to use a contractor from Abode's list?

No. Any contractor's work can qualify as long as the equipment qualifies.

Can someone review the quotes I already have?

Yes. Abode can write a quote comparison report on up to three proposed systems.

What happens after installation?

Your contractor completes Abode's quality assurance form, usually on site, with photos of all indoor and outdoor units.

Can my contractor apply for me?

Yes. Either you or your contractor may submit the rebate application.

References

Sources

This page is built from these official pages, run by the program itself.

  1. HMLP heat pump rebateshmlp.com · Read Nov 13, 2026 · Re-checked weekly
  2. HMLP rebates: all programs and eligibilityhmlp.com · Read Nov 13, 2026 · Re-checked weekly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 2, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.

    Report a problem with this page

    Nearby

    More in Massachusetts

    • All of Massachusetts

      DOER MLP Z-Loan (zero-interest loan for municipal light plant customers)

      Amount varies

      Homeowners served by a Massachusetts municipal light plant can borrow $500 to $25,000 at 0% interest for up to five years for heat pumps, heat pump water heaters, insulation and the prep work those need, after a home energy assessment.

      Verified on Nov 2, 2026

    • Customers of Eversource, National Grid, Nantucket Electric Company and 5 more utilities, Massachusetts

      Mass Save Air Source Heat Pump Rebates

      Up to $2,650 per ton, $8,500 max

      Mass Save pays $2,650 per ton (up to $8,500) for whole-home air source heat pumps, $1,125 per ton for partial-home systems and $250 per ton for basic installs in 2026, installed by a Heat Pump Installer Network contractor.

      Verified on Nov 2, 2026

    • Customers of Eversource, National Grid, Nantucket Electric Company and 5 more utilities, Massachusetts

      Mass Save Air to Water Heat Pump Rebate

      $2,650 per ton, up to $8,500

      Mass Save pays $2,650 per ton, up to $8,500, for an air-to-water heat pump that replaces oil, propane, natural gas or electric resistance heat as the primary heating system in 2026.

      Verified on Nov 23, 2026