Concord Municipal Light Plant Solar PV Rebate

Run by Concord Municipal Light Plant (CMLP)

Concord Municipal Light Plant pays $625 per kW (DC) of new solar capacity, up to $3,125 per service address.

Open Verified on Nov 23, 2026 Report a correction

Tracked since Nov 2, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.

Apply before you buy or install anything.Purchases made first don't qualify.

Amounts

How much you get

$625 per kW(DC) of installed solar PV capacity, capped at $3,125 per service address; paid to the account holder or the installer.

In the program’s own words

“CMLP Solar PV Rebate: $625 per kW(DC) of installed solar PV generation capacity, capped at $3,125 per service address. Residential installations up to 167 kW(AC) and commercial installations of any size are eligible.”

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • You get your utility service from Concord Municipal Light Plant (Massachusetts).

  • The installer must send CMLP an interconnection application with the rebate application, and CMLP must approve the install before work starts.

    What to doAsk your installer to file the CMLP interconnection and Solar PV Rebate applications.

Applying

How to apply

Your contractor applies for you. Get approved before you buy anything.

  1. Get proposals from at least three installers.
  2. Installer emails CMLP the interconnection application and CMLP Solar PV Rebate Application.
  3. Wait for CMLP's Approval to Install.
  4. Install and pass the electrical inspection.
  5. Receive CMLP's Approval to Operate, then the rebate.

Questions about applying(978) 318-3149 or pcady@concordma.gov

Your address

Next steps

Check that it covers your address. This program has to approve you before you buy anything, so start with the program, not a contractor quote.

FAQ

Questions

How much does Concord Municipal Light Plant Solar PV Rebate pay?

$625 per kW, up to $3,125. $625 per kW(DC) of installed solar PV capacity, capped at $3,125 per service address; paid to the account holder or the installer.

Do I need approval before I buy?

Yes. Apply before you buy or install anything; purchases made first don’t qualify. The installer must send CMLP an interconnection application with the rebate application, and CMLP must approve the install before work starts. Ask your installer to file the CMLP interconnection and Solar PV Rebate applications.

Is it still available?

Yes. It was open when we last checked, on November 23, 2026.

How long does approval take?

About 1 month to Approval to Install for solar-only (2 months with a battery), then about 2.5 months to Approval to Operate (4.5 months with a battery).

Can the rebate go to my installer?

Yes. You choose whether CMLP pays the electric account holder or the project installer.

When does the rebate arrive?

A check arrives 6 – 8 weeks after the Approval to Operate email; rebates of $750 or less are a credit on your electric bill.

Do I need to be home for CMLP's final site visit?

No. For the final exterior site visit the owner doesn't need to be there.

References

Sources

This page is built from these official pages, run by the program itself.

  1. CMLP solar panels and batteriesconcordma.gov · Read Nov 13, 2026 · Re-checked weekly

When one of these pages changes, we re-check this page against it.

What changedNo changes since Nov 2, 2026

Its status, amount, dates and requirements haven’t changed since we first recorded it on November 2, 2026.

    Report a problem with this page

    Nearby

    More in Massachusetts

    • Eversource, National Grid and Nantucket Electric Company customers, Massachusetts

      Mass Save ConnectedSolutions: Battery Storage

      $275 per kW a year

      Cape Light Compact, Eversource and National Grid customers who enroll a home battery in ConnectedSolutions earn $275 per kW of average contribution during summer peak events, about $1,375 a year for a typical 5 kW battery.

      Verified on Nov 13, 2026

    • Customers of Eversource, National Grid, Nantucket Electric Company and 5 more utilities, Massachusetts

      Mass Save HEAT Loan (0% Financing)

      Up to $25,000 loan

      Homeowners who are Mass Save Sponsor customers can borrow up to $25,000 at 0% interest from participating lenders for weatherization, heat pumps, heat pump water heaters, batteries and other qualifying upgrades.

      Verified on Nov 24, 2026

    • All of Massachusetts

      Massachusetts Property Tax Exemption for Solar and Wind Systems (Clause 45)

      Amount varies

      A home solar or wind system in Massachusetts, owned or leased and including one paired with battery storage, is exempt from local property tax for 20 years if it is 25 kW or less or sized to no more than 125% of the property's yearly electricity use.

      Verified on Nov 13, 2026