Scenic Rivers Energy Cooperative customers, Illinois · Rebate

EV Charger Incentives (Scenic Rivers Energy Cooperative)

Run by Scenic Rivers Energy Cooperative

Scenic Rivers Energy credits $500 for an EV charging station on co-op load control, $1,000 for a smart charger with integrated metering, or $200 toward installing a secondary meter for a regular charger.

Open Checked Oct 27, 2026

Amounts

How much you get

$500 controlled EV charging station; $1,000 smart EV charger with integrated metering; up to $200 for installing a secondary meter. The amount depends on which of these fits your install.

What you installYou get
EV charging station on load control$500
Smart EV charger with integrated metering$1,000
Secondary meter installation costsN/A

Eligibility

Do I qualify?

You need to meet all 2 of these.

  • Scenic Rivers Energy Cooperative member receiving service at the home.

  • Chargers must be on co-op load control.

    What to doArrange load control (or a secondary controlled meter) with Scenic Rivers.

Applying

How to apply

Within 3 months of purchase or installation; incentives end December 31, 2026 or when funds run out.

  1. Buy and install qualifying equipment.
  2. Fill out the 2026 EV charger incentive form.

    Attach your receipt with price and date circled, and proof of installation.

  3. Email srec@srec.net or mail to Scenic Rivers Energy Cooperative, 206 County Rd K, Lancaster WI 53813.

    Within 3 months of purchase or install.

  4. Receive a bill credit.

Forms and instructions, including for applying by mailScenic Rivers Energy Cooperative: Summary of 2026 Incentives · Scenic Rivers Energy Cooperative 2026 EV charger incentive form

Questions about applying800-236-2141

Your address

Next steps

Check that it covers your address. Then, if you want, ask for a contractor quote.

FAQ

Questions

How much does EV Charger Incentives (Scenic Rivers Energy Cooperative) pay?

$500 to $1,000, depending on what you install. The table under How much you get lists each amount.

Do I need to be a Scenic Rivers Energy Cooperative customer?

Yes. It’s only for homes in Scenic Rivers Energy Cooperative customers, Illinois. See Do I qualify for the details.

Do I need approval before I buy?

Chargers must be on co-op load control. Arrange load control (or a secondary controlled meter) with Scenic Rivers.

What’s the deadline?

Apply by December 31, 2026.

Is it still available?

Yes. It was open when we last checked, on October 27, 2026.

References

Sources

This page is built from these official pages, run by the program itself.

  1. Scenic Rivers Energy Cooperative: Energy Rebatessre.coop · Read Oct 27, 2026 · Re-checked weekly
  2. Scenic Rivers Energy Cooperative: Summary of 2026 Incentivessre.coop · Read Oct 27, 2026 · Re-checked monthly
  3. Scenic Rivers Energy Cooperative 2026 EV charger incentive formsre.coop · Read Oct 27, 2026 · Re-checked monthly

When one of these pages changes, we re-check this page against it.

Report a problem with this page

Nearby

More in Illinois

  • Ameren Illinois customers, Illinois

    ChargeReady Level 2 Charger Incentive (Ameren Illinois)

    Amount varies

    Incentives toward a Level 2 EV charger and its installation for eligible Ameren Illinois residential customers in single-family homes who are low-income or live in an environmental justice community, and who enroll in ChargeSmart.

    Checked Oct 28, 2026

  • Ameren Illinois customers, Illinois

    ChargeSmart EV Rate (Ameren Illinois)

    $4 a month

    An optional electric vehicle rate for Ameren Illinois residential customers who charge at home. You get a monthly enrollment bill credit and a per-kWh credit for power used overnight, with an added charge for your single highest-use hour between 11 a.m. and 7 p.m.

    Checked Oct 28, 2026

  • Cook, Illinois

    Climate Ready Energy Grants

    Up to $20,000

    Oak Park homeowners can get a grant of $2,500 to $20,000, depending on household income, for 2026 energy upgrades such as insulation, heat pumps, heat pump water heaters, panel upgrades, EV chargers and solar.

    Checked Oct 27, 2026