Level 2 EV Charger Rebate (Kootenai Electric Cooperative)
Run by Kootenai Electric Cooperative (rebates processed by Efficiency Services Group)
Kootenai Electric members get $20 for a new ENERGY STAR networked Level 2 EV charger on BPA's qualified products list.
Tracked since Oct 28, 2026. No change to its status, amount, dates or rules since. We re-read its official page every week.
Amounts
How much you get
$20 per qualifying Level 2 charger.
“Rebate: $20”
Eligibility
Do I qualify?
You need to meet all 2 of these.
Kootenai Electric Cooperative residential member.
ENERGY STAR certified 208/240-volt AC Level 2 model with networking capability, on BPA's Qualified Products List.
What to doChoose a charger from BPA's Qualified Products List. See what equipment counts
Equipment
What equipment counts
The program sets these minimums for ev charging.
- EV chargers
ENERGY STAR certified 208/240-volt AC Level 2 with networking capability, on BPA's Qualified Products List.
Applying
How to apply
You apply online. Within 90 days of purchase or installation.
- Pick a charger from BPA's Qualified Products List.
- Buy and install the equipment or materials.
- Submit the application with the final invoice and required documents.
Within 90 days of purchase or installation.
- Receive the rebate.
Forms and instructionsKEC Residential Rebates
Questions about applying(888) 883-9879 or rebates@esgroupllc.com
Stacking
Use it with
Your address
Next steps
Ask for a contractor quote below. The form also says whether this program covers the home’s ZIP.
Is it available at your address?
Before anything else
Step 4 of 4: request sent
We’ve saved your quote request We’ll share it only with contractors we’ve named on our lead consent page.
FAQ
Questions
How much does Level 2 EV Charger Rebate (Kootenai Electric Cooperative) pay?
$20 back.
Do I need to be a Kootenai Electric Co-op customer?
Yes. It’s only for Kootenai Electric Co-op customers in Idaho. See Do I qualify for the details.
What’s the deadline?
No fixed deadline. Apply within 3 months of purchase or installation.
Is it still available?
Yes. It was open when we last checked, on October 28, 2026.
Plain words
Words used on this page
References
Sources
This page is built from these official pages, run by the program itself.
When one of these pages changes, we re-check this page against it.
What changedNo changes since Oct 28, 2026
Its status, amount, dates and requirements haven’t changed since we first recorded it on October 28, 2026.
Nearby